How BIM Helps Achieve Higher Structural Steel Project Success

A close-up of a hand holding a pen and a tablet with BIM building information modeling illustration on screen.

Back in the old days, the process of designing and constructing projects was done with pencils and paper. Can you imagine how tedious it was for architects and engineers?

The good thing is that we are living in a fast-advancing world where technology progresses day by day. Now, there are numerous tools that architects and engineers can use to make their work easier and faster to do. One of which is Building Information Modeling (BIM).

What is Building Information Modeling?

BIM is one of the most advanced modeling software used in the architecture, engineering, and construction (AEC) industry today. It makes it easier for architects and engineers to create designs and manage every piece of information that is involved in a construction project.

To simply put, BIM can create an accurate virtual rendition of a construction project. BIM also provides an output called Building Information Model that contains digital information needed for most, if not all, aspects of a project. In that way, flaws in the design can be easily spotted and addressed right away. This, in turn, reduces the risks of problems and inefficiencies during the construction period.

Why is Building Information Modeling Important?

Buildings and other infrastructure require proper management during construction. One example is steel construction projects that involve numerous design data, which can be hard to manage and keep track of when done manually. Here’s how BIM helps in the design and construction of steel projects:

Pre-construction Phase

BIM allows architects, engineers, and contractors to easily coordinate and come up with a building model during the pre-construction phase. Both the designers and the project owner can express their expectations using BIM.

Steel projects amass a large amount of data. BIM helps in managing the data in a visual presentation. BIM also allows for an accurate estimation of cost and schedule synchronization. By using BIM before the actual construction commences, problems and other issues can be foreseen and avoided.

Construction Phase

While a steel project is being constructed, BIM can be used as an information resource. The building model can help everyone keep track of the construction schedule. When changes, such as progress in the construction, are made in the building model, the entire team will be able to see it. Even subcontractors who handle HVAC and MEPF installations can be given access to the building model. This allows the entire team to see if there are incoming conflicts in the schedule or other parts of the construction phase.

Post-Construction Phase

BIM can also help contractors that provide maintenance services for the steel projects they constructed. After the construction, essential information about the project will be saved on BIM. When issues call for maintenance services, all the information and data are accessible through BIM to provide quick and apt resolutions.

Flawless Steel Welding Uses BIM

The use of BIM in the AEC industry has become more popular these days, and it comes as no surprise. BIM does not only ease the job of people involved in the construction of a certain project, but it also immensely helps bring a higher chance of success.

To achieve our goal of providing the highest quality structural steel services, we at Flawless Steel Welding keep ourselves updated on the latest trends in construction software. We proudly say that we use BIM for the construction of projects entrusted to us.

For the best steel fabrication in Colorado, contact us. We also provide other services, such as steel erection, sandblasting, and crane services. Please feel free to reach out to us if you have any questions or inquiries.

SHARE THIS POST

Facebook
Twitter
LinkedIn

Looking For THE Best Partner For Your

Next Construction Works?